The design-build process: one contract for your design and your build
Design-build means the person who designs your house is the person who builds it. Here is how that works step by step, and why I think it gives you a smoother project and more value for your budget.
By Hugo Quintero Maldonado, licensed DRO in Baja California SurUpdated 5 min read
What design-build means
In the traditional approach you hire an architect to design, then hire one or more contractors to build, and you sit in the middle. In design-build, one team is responsible for both. You sign one contract for everything from the architecture and engineering to the construction, and you deal with one person.
I work this way on every project, from remodels and additions to custom homes and green building. It also lets me stay in control of every phase, from the design and the specifications to project management and construction.
The process, step by step
- Design. We talk about what you want and what you need, and I develop the design with you. You see what your future home will look like through detailed renderings and drawings.
- Pre-construction. Once you approve the design, I prepare the construction documents and the architectural and engineering drawings, and I submit the plans to the municipality for the permit. I don't outsource any of this, and I keep you updated. In parallel, your interior designer works with you on tile, flooring, paint colors, cabinets and finishes.
- Construction. I handle every aspect of the build, and you get progress reports and email or WhatsApp updates with photos.
- Final inspection. Near the end we walk the house together and go through the final punch list: doors and cabinet drawers that close easily, and anything else that still needs doing.
The whole thing feels like a conversation about your needs and how we make them happen together. The permit step is covered in the permits and DRO guide.
One point of contact
With the traditional architect-driven approach you often end up dealing with several contractors, depending on the project, and several contractors means several contracts, which costs time and money. Design-build replaces that with one contract and one person coordinating every part of the project and talking to you.
You avoid being the middleman between the architect, the contractor and the subcontractors. The result is better communication and a smoother project, and you can ask me about any part of it, from the drawings to the concrete, and get an answer from the same person.
A budget before work starts
I begin every project with a detailed budget and a design plan. Because one contract covers design and construction, I can give you a complete cost projection up front instead of a design you later find out you can't afford.
Before any work begins on your house, you get a detailed payment plan that lists each service, so nothing is hidden. What the house will cost depends on its size, the finishes, the lot and extras like a pool: send me those details and I'll give you a first estimate.
Fixed price or cost-plus
I offer two ways to price a design-build project. With a fixed price (precio alzado), we agree on the total for a defined scope before construction starts, which is a good fit for simpler projects and for any project where the scope is settled. With a cost-plus contract (costo reembolsable), you pay the real costs plus an agreed fee, which suits high-end homes whose design keeps evolving. Either can be used on any project, and we choose together.
Cost-plus contracts for high-end homes
For high-end custom homes, where the design keeps evolving as the house takes shape, I often use a cost-plus design-build contract (costo reembolsable). Instead of fixing one final price on day one, you pay the real, eligible costs of the work plus an agreed fee for the builder. The final cost can therefore differ from the first projection, and the contract is built around keeping that visible and under your control.
- Project definition. You set your goals, needs and design criteria, and we agree on the scope and on how decisions, approvals and changes will be handled.
- Design and documentation. I coordinate the design professionals to develop the plans and specifications. You review and approve them before construction starts, and the permits are handled in parallel.
- Estimate and planning. I prepare a cost projection and a work schedule. The projection is the reference for the build, not necessarily a maximum price.
- Construction, administration and payments. I carry out the work according to the approved documents and coordinate the crews, consultants, suppliers and subcontractors. Payment requests cover the costs incurred, with the supporting documents, and the agreed fee is applied.
- Changes and adjustments. A change in scope, design, cost or schedule is written down and approved through the agreed procedure before it's carried out. If costs are heading above the projection, we review the budget and the schedule formally.
- Inspection, handover and warranty. Near completion we inspect the work and list what is pending or needs correction, and agree how it will be completed. The contract can include a payment retention, a final payment and a warranty period.
What to settle in a cost-plus contract
- Cap or estimate: whether there is a maximum price or guarantee, or only a projection.
- Reimbursable costs: which expenses can be charged, how they are documented and which are excluded.
- The builder's fee: what it is calculated on and whether it applies to all costs or only some.
- Financial controls: periodic reports, access to receipts, prior approval of significant expenses and early warning of possible overruns.
- Your approvals: deadlines for reviewing plans, choosing materials and answering requests, since delays here move the schedule.
- Change orders: each one states what changes and its expected effect on cost and schedule.
- Risks and remedies: delays, safety, permits, warranties, insurance, suspension or termination, and how disputes are resolved.
A shorter timeline
In design-build the stages of one project can overlap while they stay coordinated and monitored, so there is no gap while a second contractor gets up to speed. Owners usually notice that the design phase is shorter, and they don't have to hire someone else to carry out the rest.
Design-build or traditional?
- Contract: one for design and construction, against separate ones for the architect and each contractor.
- Who you talk to: one person, against everyone separately.
- Budget: a fixed price or a cost-plus projection set up front with the design, against a design that may need to be redone to fit the cost.
- Timeline: overlapping stages, against one stage waiting for the next.
If you already have a designer or want a different contractor to build, I can still help: I can take the DRO role on your project or oversee the build for you.
If you live abroad
Design-build suits owners who aren't in Loreto, because one person answers for everything. The guide to building from abroad shows how a project runs from the first email to the years after the keys. If you're still looking for land, start with what to check before buying.
Planning a house in Loreto?
Email me where the land is, the lot size and what you want to build. I'll reply with the next steps.