HuQuMa Studio Logo
HuQuMa Studio
Design + Build + Manage

Building a custom home in Loreto while you live abroad

You don't need to live in Loreto to build here. This is how a project runs when the owner is in the US or Canada, from the first email to the years after the keys.

By Hugo Quintero Maldonado, licensed DRO in Baja California SurUpdated 2 min read

Owning land near the coast

Loreto sits inside Mexico's restricted zone, the strip within 50 km of the coast. Foreigners hold a home there through a bank trust (fideicomiso), which a notary public sets up when you buy.

How a project starts

  1. You email me where the land is, the lot size, what you want to build, your ideal timeline and whether you already have plans.
  2. We talk it through on a video call.
  3. I visit the lot.
  4. You receive a proposal for your house.

Design and permits

I draw the plans, elevations, and structural and engineering drawings, and put together the permit set. Then I take it through the municipality of Loreto myself, so you don't have to stand in line at an office from another country.

As a licensed DRO (Director Responsable de Obra) I also sign the project and answer for it meeting the building regulations. The documents the municipality asks for are listed in the permits and DRO guide.

Following the construction from home

I'm on site in Loreto during the build, and because design and construction are one contract, you deal with a single person. From wherever you live, you get:

  • Photos and video on WhatsApp as the work moves.
  • Email reports with what was spent against the budget.
  • Video calls at the key milestones.
  • A 3D digital twin of the house, made with Matterport, that you can walk through from your screen.

Hiring one stage or the whole house

You can hire me for the whole house or for one part of it: design and build together, design only, build only, oversight of a build run by another contractor, or care of a finished house. When someone else is building, I act as your representative on site and keep the schedule, budget and quality in check.

After the keys

If you don't live in Loreto all year, I keep looking after the house while you're away:

  • Regular inspections, maintenance and repairs.
  • Opening the house before you arrive and closing it when you leave.
  • Preparation before and after hurricanes.
  • Tracking and coordinating payment of the property tax (predial) and the electricity, water and sewer bills.
  • Getting the house ready between rental guests.

Cost and timing

Both depend on your house: its size, the finishes, the lot (slope, access, water and power) and extras such as a pool. Send me those details and I'll give you a first estimate. Once the design is set, we plan the build together and you follow its progress in the reports.

Planning a house in Loreto?

Email me where the land is, the lot size and what you want to build. I'll reply with the next steps.