Building permits and the DRO in Loreto, BCS

A new house in Loreto needs a building permit from the municipality, and from 40 m² it needs a DRO's signature on it. Here is what a DRO does, what that involves and what you'll need to have ready.

By Hugo Quintero Maldonado, licensed DRO in Baja California SurUpdated 3 min read

What a DRO is

A DRO (Director Responsable de Obra) is the licensed professional who signs a construction project and answers for it meeting the building regulations. The DRO signs the building permit and the responsiva, the document in which they take on that responsibility.

What a DRO does: plans and structure

In practice a DRO covers two jobs that, in the US or Canada, belong to different people. The first is the engineer's side. The DRO reviews, signs and stamps the construction plans (the responsiva de obra) so the municipality can issue the building permit, and for a standard house the DRO usually handles or validates the structural calculations (memorias de cálculo).

Large or complex projects add specialist co-signers for structural safety (corresponsables en seguridad estructural). A DRO is a private professional authorized by the municipality, not a city employee.

What a DRO does: the site

The second job is the inspector's side. Instead of a city inspector visiting at every phase, the DRO makes periodic site inspections, records progress and problems in the official construction logbook (bitácora de obra), enforces the local building codes and signs off on completion (constancia de terminación de obra).

Who the DRO answers to

You hire and pay the DRO, but the DRO answers to the government. If a building violates the codes or fails structurally, the DRO carries civil, administrative and even criminal liability, and that responsibility can last for years after the work is finished. That is why a DRO won't sign a project they haven't reviewed or can't follow on site.

What a DRO is not

A DRO certifies code compliance while a building is under construction. That is not the same as a buyer's home inspection of an existing house (appliances, finishes, normal wear and tear). A DRO can give a structural safety opinion (dictamen de seguridad estructural) when you ask for one. If you want me to look at a house or lot before you buy, see what to check before buying land in Loreto.

When your project needs one

  • From 40 m² (about 430 sq ft) up to 500 m² (about 5,380 sq ft) of construction: the permit and the responsiva need a DRO's signature.
  • Over 500 m², or technically complex projects such as large commercial, industrial or public buildings: a certified DRO is required.

If you're not sure which group your house falls in, send me the size and I'll tell you.

What the municipality asks for

To get a building permit (licencia de construcción) in Loreto you'll need:

  1. Proof of ownership (the deed or title) and the property tax (predial) paid up to date.
  2. The land-use certificate (uso de suelo) and the alignment and official number (alineamiento y número oficial) for the lot.
  3. Feasibility letters for water and sewer (OOMSAPAS) and for power (CFE).
  4. The architectural and structural drawings signed by the DRO, with the DRO's responsiva.

Who does what

You provide the property documents. I prepare the drawings, put the file together, take it through the municipality and sign as DRO. If you live abroad, this is the part of the process you don't have to be here for. The guide to building from abroad covers the rest of the project, and the design-build guide explains why having the designer, the builder and the DRO be the same person keeps it simple.

DRO for someone else's project

If you already have a designer or a builder, I can still take the DRO role on your project. I'm licensed in Baja California Sur and sign other builders' projects as well as my own.

Planning a house in Loreto?

Email me where the land is, the lot size and what you want to build. I'll reply with the next steps.